News
![](https://www.stoof-international.de/wp-content/uploads/2021/07/iStock-1222944460-edit.png)
![Ein STOOF-Mitarbeiter bedient eine Abkantpresse](https://www.stoof-international.de/wp-content/uploads/2021/10/stoof-web-0721-1024x683.jpg)
International student exchange 2024
23. July 2024
From June to July 2024, two students from abroad repeatedly spent 8 weeks at Stoof International GmbH gaining an insight into the complex manufacturing processes, methods and techniques of specially protected vehicles. As future engineers, they independently developed solutions, designed custom-made assemblies in the 3D CAD program and successfully manufactured them with the help of […]
![](https://www.stoof-international.de/wp-content/uploads/2022/11/STOOF_Beschuss_17.10.22-25-1024x769.jpg)
New LC 300 Trojan VR9 certified with VPAM ERV and BRV Version 3
19. December 2022
Our new LC 300 Trojan VR9 was certified according to VPAM ERV and BRV version 3. All ERV certifications were passed with 3 out of 3 stars, the side blasting was done with a distance of 2 meters! The certificates are available and can be viewed at the company upon request.